Send pool drawings (plan/sections), target depths, edge sort (skimmer or overflow), equipment record, slab information, and access notes. We survey the slab; verify stage and planarity. Assemble panels dry; bolt and torque to spec; plumb and brace. Run piping and electrical in planned chases; match hardware; pressure‑test traces.